Planning Permission Ireland
GrantedExtensionDecided 1 February 2023

144, Killester Park, Dublin 5, D05H1F8

Demolition of a rear extension to build a new partial two-storey, partial single-storey rear extension.

5313/22 · Dublin City Council · Lodged 29 November 2022

Reference
5313/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
29 November 2022

Summary

AI-generated

The project involves the demolition of an existing single-storey rear extension. It will be replaced with a new partial two-storey, partial single-storey extension measuring 41 sqm, featuring a kitchen/living/dining area, an expanded bathroom, a utility room, and a sauna.

Extensionextensiondemolitionrenovation
Storeys
2
Floor area
41 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for renovation and extension. The development will consist of the proposed demolition of existing single storey extension and construction of a new partial 2-storey, partial single storey extension to the rear of the property. Proposed works to measure a total of 41sqm additional floor area, to include new kitchen/living/ dining at ground floor level and additional floor area to existing family bathroom at first floor level. Internal modifications include construction of ground floor wc, utility and sauna. External works include replacement glazing and external insulation to all elevations. Works will be constructed to include all associated external services, drainage and landscaping as required as part of the development.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 28 August 2023.

Notified floor area: 114

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
157 Killester Pk, Dublin 5, DublinNov 2025€405,00057 m
18 Abbey Court, Killester, Dublin 5Aug 2025€494,00063 m
26 Abbey Court, Abbey Park, KillesterDec 2025€520,00079 m
42 Craigford Dr, Killester, Dublin 5Sept 2025€650,01090 m
18 Craigford Dr, Killester, Dublin 5Oct 2025€545,00097 m
61 St Brigids Grove, Artane, Dublin 5Nov 2025€665,000110 m
27 Craigford Drive, Killester, Dublin 5Oct 2025€535,000122 m
39 Craigford Ave, Artane, Dublin 5Mar 2025€565,000156 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 November 2022
  2. Decision due1 February 2023
  3. Decision issued1 February 2023
  4. Permission expiry28 April 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.