Planning Permission Ireland
GrantedAlterationsDecided 22 February 2023

Nos. 22, 23, (incorporating 23A) and 24 Aungier Street (Protected Structures) and No. 40 Bow Lane East, Dublin 2

Modifications to a previously approved development on Aungier Street.

5485/22 · Dublin City Council · Lodged 20 December 2022

Reference
5485/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 December 2022

Summary

AI-generated

The development consists of modifications to a previously approved scheme at protected structures on Aungier Street. It includes the omission of a 200 sq. m. basement level to the rear and minor internal modifications to the ground and mezzanine levels.

Alterationsprotected structurebasementmodifications

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of modifications to the previously approved development, (application reg ref. 4170/18, abp-303453-19), consisting of the omission of the 200 sq. M. Basement level to the rear of no. 23 and 24 aungier street and no. 40 bow lane east, minor internal modifications to the previously approved ground and mezzanine levels to include the relocation of toilets and service areas and all associated site works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 August 2024.

Notified floor area: 496.93

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 9, Sherbourne, Aungier StApr 2025€300,00059 m
Apartment 2, Sherborne, 26 Aungier StreetMay 2025€274,00059 m
18 Sherborne, Aungier St, Dublin 2Jun 2025€288,00059 m
11 Clarendon Hall, Aungier St, Dublin 2Sept 2025€420,99689 m
32 Clarendon Hall, Aungier Street, Dublin 2Jul 2025€505,00089 m
57 Grafton Hall, Aungier St, Dublin 2price excludes VATDec 2025€287,000105 m
56 Adelaide Square, Whitefriar Street, Dublin 8Mar 2025€475,000129 m
91 Adelaide Sq, Whitefriar St, Dublin 8Feb 2025€340,000129 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2022
  2. Decision due22 February 2023
  3. Decision issued22 February 2023
  4. Permission expiry25 May 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.