Planning Permission Ireland
InvalidCommercialDecided 14 July 2022

8, Hanover Quay, Dublin 2

Installation of two illuminated yellow signs on the front elevation of a building at Hanover Quay.

DSDZ4435/22 · Dublin City Council · Lodged 8 July 2022

Reference
DSDZ4435/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 July 2022

Summary

AI-generated

The development consists of installing one high-level illuminated steel sign 21.1m above street level, and one illuminated sign above the eastern pedestrian doorway at ground floor level. The application relates to development within a Strategic Development Zone.

Commercialsignagecommercialsdz

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consists of (i) permission for 1 no. High level sign composed of built-up steel letters with 100mm return painted black, 8mm opal acrylic face illuminated (bright white led) which will appear 'bright yellow' (yellow vinyl metamark m4-330m) with a weight of approximately 60kg, (5.6 sq. M in area, 21.1m above street level) on south (front) elevation; (ii) 1no. Above doorway sign composed of built-up steel letters with 100mm return painted black, 8mm opal acrylic face illuminated which will appear 'bright yellow' with a weight of approximately 45kg which will be located at ground floor level above on the south (front) elevation to the eastern permitted pedestrian access, (2.2 sq. M in area, 5.8m above street level) and all ancillary works necessary to facilitate the development. The application relates to development within a strategic development zone.

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
20 Hanover Court, Hanover Quay, DublinFeb 2026€745,00041 m
Apartment 24, Hanover Court, Hanover QuayJul 2025€780,00041 m
Apt 26, Hanover Court, Hanover QuayDec 2025€790,00041 m
54 Waterfront Apts, Hanover Quays, Dublin 2Dec 2025€911,000139 m
3 The Waterfront, Hanover Quay, Dublin 2Jun 2025€576,250139 m
43 The Waterfront, Hanover Quay, Dublin 2Jun 2025€455,000139 m
Apt 36, The Water Front, Hanover QuayAug 2025€795,000139 m
27 The Waterfront, Hanover Quay, Grand Canal Quay Dublin 2Dec 2025€925,000139 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 July 2022
  2. Decision due1 September 2022
  3. Decision issued14 July 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.