Planning Permission Ireland
GrantedExtensionDecided 28 March 2022

61, Hazelwood Park, Artane, Dublin 5

Part two-storey front and side extension, garage conversion, attic conversion with rear dormer, and widened driveway access.

WEB1072/22 · Dublin City Council · Lodged 1 February 2022

Reference
WEB1072/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
1 February 2022

Summary

AI-generated

This extensive development includes a part two-storey front and side extension, converting the existing garage, and removing a side chimney. It also features an attic conversion to a store/office with a rear dormer, and widening the existing vehicular access.

Extensionextensionattic conversiongarage conversiondormer

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development consists of a part 2 storey extension to the front & side of existing house with provision to convert the existing garage and to remove the existing chimney to the side and to construct a hipped roof over the proposed 1st floor extension to the side of existing house to include 1no. Roof window to the side hipped roof and to convert the existing attic space to a store/office area with provision for a dormer roof extension to the rear & to widen the existing vehicular access to the front exiting onto hazelwood park and for all associated site works.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 February 2023.

Notified floor area: 57

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
59 Hazelwood Park, Artane, Dublin 5May 2025€555,00013 m
57 Hazelwood Park, Artane, Dublin 5Dec 2025€545,00021 m
71 Hazelwood Park, Artane, Dublin 5Oct 2025€480,00045 m
73 Hazelwood Park, Artane, Dublin 5Sept 2025€602,00050 m
134 Hazelwood Park, Artane, Dublin 5Oct 2025€495,00078 m
70 Hazelwood Park, Artane, Dublin 5Sept 2025€595,00093 m
17 Hazelwood Park, Artane Dublin 5, DublinMay 2026€521,000123 m
44 Hazelwood Dr, Artane, Dublin 5not full market priceMar 2025€520,000129 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 February 2022
  2. Decision due28 March 2022
  3. Decision issued28 March 2022
  4. Grant issued11 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.