Planning Permission Ireland
GrantedExtensionDecided 4 May 2021

43, Blythe Avenue, East Wall, Dublin 3

Attic conversion with a rear dormer, rebuilding of a two-storey rear return, and associated alterations.

WEB1233/21 · Dublin City Council · Lodged 10 March 2021

Reference
WEB1233/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
10 March 2021

Summary

AI-generated

The project involves converting the attic space into a habitable room with a rear dormer window and two rooflights. It also includes rebuilding the two-storey rear return, raising its roof level, inserting a bay window, and relocating a rear pedestrian entrance.

Extensionattic conversiondormerextension
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of
  • The conversion of the existing attic space to a habitable room with the addition of a dormer window to the rear pitch of the main roof
  • The insertion of two rooflights to the main roof, one to the rear and one to the front
  • The partial removal and rebuilding of the existing 2 storey rear return including raising the return roof level by ~400mm
  • The insertion of a small bay window at 1st floor level to the rear wall of the rebuilt return
  • The reconfiguring of the existing window at ground floor level beneath the arch on the front façade
  • The relocation of the existing pedestrian entrance on the rear boundary wall from the east to the west side and the partial rebuilding of the existing wall in matching stonework. All proposed works to be undertaken in conjunction with miscellaneous exempted development works including removal and rebuilding of an existing single storey ground floor rear extension of ~6.5sqm and the addition of a further ~4.5 sqm of floor space at ground floor level at the rear as shown on drawings

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 9 July 2021.

Notified floor area: 18.2

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
77 Church Rd, East Wall, Dublin 3Sept 2025€440,00083 m
34 Russell Ave, East Wall, Dublin 3Aug 2025€420,00083 m
46 Church Rd, East Wall, Dublin 3Jun 2025€470,000104 m
44 Russell Ave, East Wall, Dublin 3Feb 2025€420,000125 m
46 Russell Avenue, East Wall, Dublin 3Aug 2025€225,000133 m
63 Russell Avenue, East Wall, Dublin 3May 2025€423,000149 m
2 Hawthorn Close, Hawthorn Avenue, East WallApr 2025€672,000149 m
62 Russell Ave, East Wall, Dublin 3Feb 2025€365,000153 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 March 2021
  2. Decision due4 May 2021
  3. Decision issued4 May 2021
  4. Grant issued21 June 2021

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.