Planning Permission Ireland
Awaiting decisionChange of useDecided 2 April 2026

19, The Orchard, Killester, Dublin 5, D05 D613

Conversion and extension of a pre-school facility into a two-bedroom house in Killester.

WEB1257/26 · Dublin City Council · Lodged 6 February 2026

Reference
WEB1257/26
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 February 2026

Summary

AI-generated

The application seeks to change the use of a single-storey detached pre-school and after-school facility into a two-storey, two-bedroom detached house. The project includes a 38.81 square metre extension, site subdivision, boundary modifications, and a new pedestrian entrance.

Change of useconversionextensioncreche
Residential unit
1
Storeys
2
Floor area
84 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The change of use and extension of the existing single storey, detached, pre-school playgroup and after-school child care facility, 45.54 sq metres total floor area, to use as a two-storey, detached, two bed residential dwelling, 84.35 sq metres total floor area (area of extension 38.81 sq metres). Also for the subdivision of the overall site to accommodate the new detached dwelling (overall site area c. 325.85 sq metres, site area of new dwelling c. 191.74 sq metres, new site area of existing dwelling c. 134.11 sq metres ). Also for changes to the glazing of the existing dwelling. Also for the modification of the existing boundary walls and new boundary, to include a new pedestrian entrance to the front and new internal boundary fence, and associated site works to facilitate the development. Also for the modification of the existing surface water and foul water services to accommodate the new dwelling.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Abbeyfield Lawns, Abbeyfield, Killester Dublin 5Feb 2025€500,00024 m
Apt 8, Three Garange Lodge Ave, Clongriffin Dublin 13Jan 2025€268,00059 m
29 The Orchard, Killester, Dublin 5Mar 2026€520,00070 m
8 Abbeyfield Lawns, Killester, Dublin 5Jul 2026€711,00070 m
9 La Vista Ave, Killester, Dublin 5Sept 2025€610,00085 m
2 The Orchard, Killester, Dublin 5Jul 2026€450,00088 m
35 Middle Third, Killester, Dublin 5Mar 2026€680,000133 m
49 Abbeyfield, Killester, Dublin 5May 2025€710,000152 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 February 2026
  2. Decision due2 April 2026
  3. Decision issued2 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.