Planning Permission Ireland
GrantedAlterationsDecided 16 April 2025

33, 34 & 35 Wicklow Street, Dublin 2

Replacement of 14 timber windows on the front facade of buildings on Wicklow Street.

WEB1372/25 · Dublin City Council · Lodged 25 February 2025

Reference
WEB1372/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
25 February 2025

Summary

AI-generated

Planning permission is sought for the removal of existing hardwood timber sliding sash and casement windows. They will be replaced with new double-glazed timber windows matching the existing patterns across the first, second, and third floors of 33, 34, and 35 Wicklow Street.

Alterationswindowsrenovationcity centre
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission is sought for the careful removal of existing hardwood timber sliding sash and casement windows and replacement thereof with new hardwood timber framed double glazed sliding sash and casement windows to match existing fenestration patterns to a total of 14 no. Windows to the wicklow street facing façade only at the first and second levels of the existing 3 storey plus converted attic over ground level buildings 33 & 34 wicklow street, dublin 2 and at the first, second and third floor levels of the existing 3 storey over ground level building at 35 wicklow street, dublin 2.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt B, 116 Grafton Street, Dublin 2May 2026€660,000165 m
Apartment 1, 17 Fade Street, Dublin 2Feb 2026€1,275,000207 m
Apartment 5, 50-52 Dame Street, Dublin 2Nov 2025€395,000254 m
3 Fownes St, Temple Bar, Dublin 2May 2026€1,600,000255 m
Apt 1, 3 4 Cope St, Dublin 2Oct 2025€2,250,000263 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,000274 m
Apt 39 Wicklow Court, 38 40 South Great Georges St, Dublin 2Mar 2025€295,000274 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,000277 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 February 2025
  2. Decision due17 April 2025
  3. Decision issued16 April 2025
  4. Permission expiry7 July 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.