Planning Permission Ireland
GrantedRetentionDecided 17 April 2025

80-82 Philipsburgh Avenue, Dublin 3

Retention of a temporary 15-metre telecommunications monopole structure in Fairview for 24 months.

WEB1389/25 · Dublin City Council · Lodged 27 February 2025

Reference
WEB1389/25
Authority
Dublin City Council
Register status
Appealed
Type
Retention Permission
Received
27 February 2025

Summary

AI-generated

This application seeks retention permission for an existing temporary 15-metre transportable monopole structure secured by concrete ballast blocks. The retention is sought for a defined period of 24 months and includes associated antennas, dishes, and equipment cabinets.

Retentionretentiontelecomstemporary

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Retention :the development will consist of: retention of the existing temporary telecommunications structure, for a defined period of 24 months, consisting of a 15m transportable monopole structure secured by 4 anchor bolts to 4 no. 2m x 2m x 1m removable concrete ballast blocks; & all associated antennas, dishes and ancillary ground-based equipment cabinets. Situated within the construction site hoarding on a section of land at 80
  • 82 philipsburgh avenue, fairview, dublin 3, d03h3f1

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
147 Brian Rd, Marino, Dublin 3Sept 2025€565,00068 m
2 Annadale Ave, Fairview, Dublin 3Sept 2025€538,00085 m
144 Brian Road, Marino, Dublin 3Apr 2026€752,50093 m
63 Shelmartin Ave, Marino, Dublin 3Nov 2025€595,000114 m
93 Shelmartin Ave, Marino, Dublin 3May 2025€557,000117 m
79 Philipsburgh Ave, Fairview, Dublin 3Nov 2025€635,000131 m
77 Philipsburgh Ave, Fairview, Dublin 3Aug 2025€630,000136 m
15 Lomond Ave, Fairview, Dublin 3Dec 2025€806,970145 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 February 2025
  2. Decision due23 April 2025
  3. Decision issued17 April 2025
  4. Appeal submitted14 May 2025
  5. Appeal decided29 September 2025
  6. Permission expiry12 November 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.