Planning Permission Ireland
GrantedExtensionDecided 23 August 2023

45, Killester Park, Clontarf West, Dublin 5 D05 R2A4

Demolition of existing extensions and construction of new front, side, and rear extensions with an attic conversion in Clontarf West.

WEB1545/23 · Dublin City Council · Lodged 29 June 2023

Reference
WEB1545/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
29 June 2023

Summary

AI-generated

The project involves demolishing the existing side and rear extensions and front porch. It will be replaced with a single-storey flat roof extension to the front, side, and rear, alongside widening the vehicular access and converting the attic into a store and study with a new dormer window.

Extensiondemolitionextensionattic conversion

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will consist of the demolition of the existing side & rear extension and front porch. The proposed construction of the following: (a) a single-story flat roof extension to the north west (front & side) elevation and to the east (rear) elevation and a new entrance canopy (b) widening of an existing vehicular access at the front of the property (c) conversion of the attic to a store and study room incorporating new velux roof light to the front and new dormer to the side and rear (d) associated demolitions, internal layout alterations, drainage, landscaping and associated site works.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 26 July 2024.

Notified floor area: 117.8

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
39 Killester Park, Killester, Dublin 5Dec 2025€625,00033 m
87 Killester Park, Killester, Dublin 5Jun 2025€690,00081 m
81 Killester Park, Killester, Dublin 5Aug 2025€575,00098 m
8 Abbeyfield Lawns, Killester, Dublin 5Jul 2026€711,00099 m
75 Killester Park, Killester, Dublin 5Apr 2026€550,000112 m
42 Craigford Dr, Killester, Dublin 5Sept 2025€650,010135 m
9 La Vista Ave, Killester, Dublin 5Sept 2025€610,000157 m
1 Abbeyfield Lawns, Abbeyfield, Killester Dublin 5Feb 2025€500,000159 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 June 2023
  2. Decision due23 August 2023
  3. Decision issued23 August 2023
  4. Permission expiry16 November 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.