Planning Permission Ireland
GrantedChange of useDecided 23 October 2025

77-78, Dame Street, Dublin 2, D02RK60

Change of use of the upper floors of a protected building on Dame Street from offices to a language school.

WEB1570/25 · Dublin City Council · Lodged 18 March 2025

Reference
WEB1570/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
18 March 2025

Summary

AI-generated

The project involves converting the first, second, third, and fourth floors of a protected structure from commercial/office use to a language school. Works will include repairing the front sliding sash windows, replacing rear windows with timber sash windows, and altering internal layouts to update bathroom facilities.

Change of useschoolheritagecity centre

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: planning permission is sought for the change of use of the existing property at first, second, third & fourth floor from former commercial/office to use as a language school. Remedial works the front elevation of building including retention and improvement of the seiko signage. Repair & upgrade of existing sliding sash windows to fore & replacement of windows to rear with correct timber sliding sash windows. Alteration of internal of layout ground, first, second & third floor to provide for revised bathroom facilities.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 18, Royal Exchange Building, Parliament St Dublin 2Sept 2025€335,00043 m
3 Royal Exchange, Parliament St, Dublin 2Dec 2025€315,00043 m
Apt 9, Royal Exchange Building, Parliament StApr 2026€295,00043 m
Apt.1, 17-19 Wexford Street, Dublin 2May 2026€1,800,00059 m
4 Palace Gardens, Dame St, Dublin 2May 2026€375,00061 m
Apt 12, Parliament Buildings, 38 40 Parliament St Dublin 2Sept 2025€310,00080 m
7 The Cutlers, Exchange St., Dublin 8Jun 2025€370,00092 m
Apt 1, The Cutlers, 3 6 Exchange St Upper Dublin 2Oct 2025€359,00092 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 March 2025
  2. Decision due23 October 2025
  3. Decision issued23 October 2025
  4. Permission expiry15 January 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.