Planning Permission Ireland
GrantedExtensionDecided 26 August 2022

13, Elm Park Terrace, Dublin 6w

Demolition of a rear extension to build a new single-storey extension with solar panels in Dublin 6w.

WEB1617/22 · Dublin City Council · Lodged 4 July 2022

Reference
WEB1617/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
4 July 2022

Summary

AI-generated

The development consists of demolishing an existing single-storey rear extension and constructing a new single-storey rear extension with a pitched glazed roof and a flat sedum roof. It also includes internal alterations, solar panels, and modifications to the rear boundary wall.

Extensionextensionsolarsedum roofcottage
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of demolition of existing single storey rear extension, and construction of new single storey rear extension, with a pitched portion of roof with glazing facing south, and flat portion of roof with sedum patch, new internal layout and addition of roof lights and solar panels to front and rear of existing cottage roof, modification of existing rear boundary wall to include 50mm vertical slits to allow additional light into proposed yard, with relocation of existing rear lane access, and all ancillary site works.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
13 Elm Park Terrace, Terenure, Dublin 6wApr 2026€805,0003 m
2 Terenure Square, Terenure, Dublin6wDec 2025€900,00025 m
124 Terenure Rd North, Dublin 6, DublinApr 2026€420,00050 m
18 Hannaville Park, Terenure, Dublin 6wJul 2025€1,455,00071 m
101a Terenure Rd North, Terenure, Dublin 6wJan 2026€255,00075 m
Upstairs Apartment, 81 Terenure Road North, TerenureApr 2025€350,00080 m
7 Eaton Court, Terenure Rd North, Terenure Dublin 6wJan 2025€400,000103 m
6 Rathmore Villas, Terenure, Dublin 6wAug 2025€577,000111 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 July 2022
  2. Decision due26 August 2022
  3. Decision issued26 August 2022
  4. Grant issued7 October 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.