Planning Permission Ireland
GrantedAlterationsDecided 21 May 2025

30-31, Liffey Street Lower, Dublin 1

Alterations to ground floor windows, a new shopfront, and internal changes including a new lift and stairs.

WEB1667/25 · Dublin City Council · Lodged 28 March 2025

Reference
WEB1667/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
28 March 2025

Summary

AI-generated

The project involves reinstating ground floor windows to their original openings on the north elevation and fitting a new shopfront and signage on the east elevation. Internal alterations include installing a new lift and stairs, relocating roof air handling units, and using the ground floor for retail and the first floor for offices.

Alterationsretailofficerenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The reinstating of the ground floor windows to the north elevation in their original openings, the fitting of new shop front and signage to east elevation, the relocation of the existing air handling units to the roof, internal alterations to include the fitting of a new lift, and the construction of new stairs, the use of the ground floor as retail and the 1st floor as offices and all associated site works

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
198 Bachelors Walk, Dublin 1, DublinMar 2026€260,00027 m
Apt 307, Bachelors Walk, Dublin 1Mar 2026€293,50027 m
201 Bachelors Walk Apts, Liffey St Lower, Dublin 1Jul 2026€400,00027 m
Apt 49, Bachelors Walk, Dublin 1Sept 2025€275,00049 m
265 Bachelors Walk, Dublin 1, DublinMar 2025€305,00050 m
Apt 1, 38 Lower Ormond Quay, Dublin 1Dec 2025€2,100,00055 m
213 Bachelors Walk, Dublin 1, DublinApr 2025€262,00065 m
Apt 215 Bachelors Walk, Norths Lotts, Dublin 1Jul 2026€257,00069 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 March 2025
  2. Decision due22 May 2025
  3. Decision issued21 May 2025
  4. Permission expiry9 August 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.