Planning Permission Ireland
GrantedExtensionDecided 18 September 2024

34 Craigford Drive, Killester, Dublin 5, D05 Y9K4

Demolition of a side annex to build a two-storey side extension, a single-storey rear extension, and an attic dormer.

WEB1735/24 · Dublin City Council · Lodged 12 June 2024

Reference
WEB1735/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
12 June 2024

Summary

AI-generated

The development at 34 Craigford Drive involves demolishing a side annex to construct a two-storey side extension and a single-storey rear extension. It also includes an attic conversion with a rear dormer, front solar panels, and widening of the front vehicular access.

Extensionextensiondemolitionsolardormer

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for the following:1)to demolish the existing single storey annex to the side of existing two storey dwelling & replace with a two storey extension with matching ridge & eaves heights 2)to build a single storey extension to the rear of the existing dwelling 3)to add attic storage with a dormer to the rear
  • Minor fenestration alterations to the existing dwelling 5)a pv solar panel array to the front 6)all associated site works including widening the existing vehicular access & existing dished kerb to the front

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 9 December 2024.

Notified floor area: 69

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
42 Craigford Dr, Killester, Dublin 5Sept 2025€650,01031 m
27 Craigford Drive, Killester, Dublin 5Oct 2025€535,00052 m
18 Craigford Dr, Killester, Dublin 5Oct 2025€545,00064 m
157 Killester Pk, Dublin 5, DublinNov 2025€405,00083 m
26 Abbey Court, Abbey Park, KillesterDec 2025€520,000112 m
39 Killester Park, Killester, Dublin 5Dec 2025€625,000118 m
18 Abbey Court, Killester, Dublin 5Aug 2025€494,000131 m
24 Abbey Park, Killester, Dublin 5Jan 2026€565,000152 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 June 2024
  2. Decision due18 September 2024
  3. Decision issued18 September 2024
  4. Permission expiry18 December 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.