Planning Permission Ireland
GrantedExtensionDecided 22 August 2024

Side & Rear 27 Camac Park, Bluebell, Dublin 12

Construction of a flat roof box dormer first-floor extension to a previously approved detached bungalow.

WEB1786/24 · Dublin City Council · Lodged 1 July 2024

Reference
WEB1786/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
1 July 2024

Summary

AI-generated

The development consists of the construction of a flat roof box dormer first-floor extension to the southeast elevation of a previously approved 3-bedroom detached bungalow. The previously approved works included the sub-division of the site, a new vehicular entrance, and boundary walls.

Extensiondormerextensionbungalow
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for construction of a flat roof box dormer first floor extension to southeast elevation of previously approved 3 bed detached bungalow - development reference web1656/22 (work not yet commenced). Works previously approved included sub-division of existing site at side and rear of 27 camac park to provide new 3 bed detached bungalow, new vehicular entrance on camac park, right of way from camac park, new vehicular access gates, 2 car parking spaces and 2.8m(h) boundary walls plus all necessary site and drainage works.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 3 February 2025.

Notified floor area: 142

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
17 Camac Park, Bluebell, DublinSept 2025€270,00060 m
3 Nugget Cottages, Bluebell Lane, BluebellMay 2025€335,000112 m
Nos 1-21 Bluebell Court, Camac Park Bluebellprice excludes VATMay 2026€8,560,477129 m
Nugget House, Bluebell Lane, BluebellMay 2025€1,005,000174 m
2 Nugget Cottages, Bluebell Lane, BluebellMay 2025€335,000174 m
Nugget House, Bluebell Lane, BluebellMay 2025€335,000174 m
Woodview, Annaghbrack, BluebellJun 2025€280,000458 m
27 Millrose Est, Bluebell Ave, Bluebell Dublin 12Apr 2025€328,000496 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 July 2024
  2. Decision due23 August 2024
  3. Decision issued22 August 2024
  4. Permission expiry20 November 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.