Planning Permission Ireland
InvalidAlterationsDecided 16 October 2023

14, Gilbert Road, Dublin 8

Installation of external insulation, solar panels, a heat pump, and demolition of the front porch.

WEB1861/23 · Dublin City Council · Lodged 9 October 2023

Reference
WEB1861/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
9 October 2023

Summary

AI-generated

The project involves energy efficiency upgrades and alterations to a terraced dwelling, including external wall insulation, solar panels on the southern and western roofs, and an air source heat pump. It also includes the demolition of the front porch, modification of external openings, replacement of windows and doors, and a new timber boundary fence.

Alterationsretrofitsolarheat pumpinsulation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the installation of external insulation and associated render system to external walls of the existing part two-storey, part single-storey, terraced dwelling, the installation of solar panels to the southern and western roofs of the principal structure, the installation of an air source heat pump to the private amenity space to the south of the dwelling, the demolition of the existing front porch, the modification of external opes to the southern and western elevations, the replacement of all windows and external doors, the provision of a 1.8m tall timber fence to the southern and south-western boundary to delineate the proposed private amenity space and internal alterations and all associated site and drainage works,

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 7 February 2024.

Notified floor area: 99

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Gilbert Rd, Dublin 8, DublinAug 2025€650,00021 m
26 Dufferin Ave, S C R, Dublin 8Oct 2025€853,00062 m
4 Gilbert Road, South Circular Road, Dublin 8Feb 2025€556,00072 m
2 Gilbert Rd, Dublin 8, DublinJun 2026€955,00082 m
39 St Albans Rd, Circular Rd South, Dublin 8May 2025€624,00083 m
35 St Albans Rd, South Circular Rd, Dublin 8Mar 2026€750,00093 m
15 Ingram Rd, Dublin 8, DublinNov 2025€749,000104 m
30 St Albans Road, South Circular Road, Dublin 8Jul 2025€780,000108 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 October 2023
  2. Decision due1 December 2023
  3. Decision issued16 October 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.