Planning Permission Ireland
Awaiting decisionAlterationsDecision was due 19 June 2026

The Arts Building, Trinity College Dublin, College Street, Dublin 2

Replacement of the roof overhang soffit cladding at the Trinity College Arts Building.

WEB1991/26 · Dublin City Council · Lodged 27 April 2026

Reference
WEB1991/26
Authority
Dublin City Council
Register status
In progress
Type
Permission
Received
27 April 2026

Summary

AI-generated

Trinity College Dublin is seeking permission to remove the existing soffit cladding from the roof overhang of the Arts Building. It will be replaced with a new jointed fibre-cement soffit cladding system in a selected colour. The building is a protected structure.

Alterationsuniversityheritagemaintenance

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: we, trinity college dublin (c/o the estates and facilities directorate) intend to apply for permission for development at this site the arts building, trinity college dublin, college street, dublin
  • The development will consist of the removal of the existing soffit cladding material from the roof overhang of the arts building (protected structure rps no. 2006), and its replacement with a new jointed fibre-cement soffit cladding system to selected colour to the soffit of the existing metal overhanging roof structure

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt B, 116 Grafton Street, Dublin 2May 2026€660,000190 m
14 College Close, Tara St, Dublin 2Nov 2025€320,000304 m
38 Trinity Plaza, Pearse St, Dublin 2Jun 2026€394,000320 m
46 Trinity Plaza, Tara St, Dublin 2Apr 2026€475,000320 m
25 Trinity Plaza, Townsend St, Dublin 2Aug 2025€518,000320 m
33 Trinity Plaza, Tara St, Dublin 2Jul 2025€250,000320 m
Apt 3 Lafayette Building, 1 5 Dolier St, DublinOct 2025€400,000389 m
Apartment 3, 20 Clare Street, Dublin 2Nov 2025€442,666404 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 April 2026
  2. Decision due19 June 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.