Planning Permission Ireland
GrantedAlterationsDecided 16 July 2025

17 Shrewsbury Road, Ballsbridge, Dublin 4

Modifications to entrance piers, replacement of gates, and addition of decorative railings.

WEB2136/25 · Dublin City Council · Lodged 23 May 2025

Reference
WEB2136/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
23 May 2025

Summary

AI-generated

The development consists of modifications to existing brick entrance piers using natural granite. It also includes replacing existing steel gates with taller ones and adding decorative steel railings to the top of the boundary wall.

Alterationsboundarygatespiers

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the following: (ii) modification to existing brick piers including the addition of natural granite to the existing brick piers to either side of the vehicular access opening and a new brick pier with granite detailing to the south side of the pedestrian access opening. (ii) the removal of the existing painted steel gates to the vehicular and pedestrian access and replacement with new taller steel gates to both openings. (iii) the addition of a decorative painted steel railing to the top of the existing boundary wall to the road, so providing a height of c. 2.05 metres from the footpath level to the top of proposed railing.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Shrewsbury Gardens, Ballsbridge, Dublin 4price excludes VATMar 2025€2,555,066130 m
Mulcaire, 40a Ailesbury Rd, Dublin 4Mar 2026€10,000,000152 m
6 Shrewsbury Gardens, Ballsbridge, Dublin 4price excludes VATMar 2025€3,964,758162 m
78 Ailesbury Rd, Ballsbridge, Dublin 4Feb 2025€2,100,000204 m
37 Ailesbury Rd, Ballsbridge, Dublin 4Apr 2025€5,200,000239 m
61 Ailesbury Rd, Ballsbridge, Dublin 4Mar 2026€5,750,000241 m
29 Ailesbury Rd, Ballsbridge, Dublin 4Oct 2025€1,500,000257 m
29 Ailesbury Rd, Dublin 4, DublinOct 2025€2,000,000257 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 May 2025
  2. Decision due17 July 2025
  3. Decision issued16 July 2025
  4. Permission expiry4 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.