Planning Permission Ireland
GrantedExtensionDecided 11 January 2022

41, Dowth Avenue, Dublin 7

Construction of a front porch, a first-floor rear extension, and a rear dormer window.

WEB5081/21 · Dublin City Council · Lodged 8 November 2021

Reference
WEB5081/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 November 2021

Summary

AI-generated

The development consists of a 2 sq m front porch, a 6 sq m first-floor rear extension, and an 8 sq m rear dormer attic conversion. It also includes the partial demolition of the existing porch and rear extension roof, alongside internal layout adjustments.

Extensiondormeratticporch
Floor area
16 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a ground floor porch addition of 2 squared meters to the front of the house, a 6 square meter extension at first floor level to the rear elevation and a dormer addition at attic level to the rear elevation, (overall 8 meters squared). Partial demolition of the existing entrance porch and existing rear extension roof at ground floor level. Adjustment to the internal layout at second floor level and a new stair between the first floor and attic levels, with an en-suite to the attic room.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 April 2025.

Notified floor area: 8

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
41 Newgrange Rd, Cabra, Dublin 7May 2025€190,00042 m
28 Dowth Avenue, Cabra, Dublin 7not full market priceDec 2025€335,00047 m
61 Dowth Ave, Cabra, Dublin 7Apr 2025€641,78974 m
9 Newgrange Rd, Cabra, Dublin 7Nov 2025€515,00076 m
3 Leix Rd, Cabra, Dublin 7Sept 2025€475,00077 m
5 Newgrange Rd, Cabra, Dublin 7Mar 2026€570,00083 m
5 Leix Rd, Dublin 7, DublinJul 2025€425,00089 m
7 Cuala Rd, Cabra, Dublin 7Mar 2025€483,500111 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 November 2021
  2. Decision due11 January 2022
  3. Decision issued11 January 2022
  4. Grant issued22 February 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.