Planning Permission Ireland
InvalidAlterationsDecided 28 January 2025

South Bank House, Barrow Street, Dublin 4, D04TR29

Google Ireland intends to paint a large mural on the side of South Bank House in Dublin 4.

WEBDSDZ1129/25 · Dublin City Council · Lodged 23 January 2025

Reference
WEBDSDZ1129/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
23 January 2025

Summary

AI-generated

The proposed development consists of a mural measuring approximately 724 square meters on the northern side elevation of the existing office building. The mural will extend from the first floor level up to the seventh floor level. The site adjoins a protected structure, but no works are proposed to that structure.

Alterationsmuralofficegoogle
Storeys
7

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

We, google ireland (limited), intend to apply for planning permission for development at this site at south bank house, barrow street, dublin 4, d04 tr29. The application relates to a proposed development within the north lotts and grand canal dock strategic development zone (sdz) planning scheme area. The application site adjoins protected structure rps no. 486 (located to the rear of south bank house). (there are no works proposed to the protected structure). The development will consist of a mural (c. 724 sqm), at the (side) northern elevation of the existing office building known as south bank house and will extend from 1st floor level to 7th floor level.

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
81 The Dock Mill, Barrow Street, Grand Canal DockSept 2025€505,00032 m
17 Dock Mill, Barrow St, Dublin 4Nov 2025€381,25032 m
16 The Dock Mill, Barrow St, Dublin 4Feb 2026€390,00032 m
Apt 4, The Dock Mill, Barrow St Dublin 4Sept 2025€385,00032 m
12 Dock Mill Apts, Barrow St, Dublin 4Jun 2025€672,00032 m
61 Dockmill, Barrow St, Dublin 4May 2025€560,00032 m
75 Dock Mill, Barrow St, Dublin 4Feb 2025€470,00032 m
54 Dock Mill, Barrow St, Dublin 4Mar 2026€500,00032 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 January 2025
  2. Decision due19 March 2025
  3. Decision issued28 January 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.