5, The Lawn, Woodpark, Ballinteer, Dublin 16
Retention of a two-storey rear extension.
D05A/0821 · Dun Laoghaire Rathdown County Council · Lodged 29 June 2005
- Reference
- D05A/0821
- Authority
- Dun Laoghaire Rathdown County Council
- Register status
- Decided
- Type
- Permission for Retention
- Received
- 29 June 2005
Summary
AI-generatedPlanning permission is sought to retain an existing two-storey extension built at the rear of the property.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Retention sought for a two-storey extension to rear.
Land-use zoning
What this land is zoned for
“A To provide residential development and improve residential amenity while protecting the existing residential amenities”
Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 4 The Glade, Woodpark, Ballinteer Dublin 16 | Jun 2026 | €715,000 | 76 m |
| 9 Ballinteer Court, Dublin 16, Dublin | Jun 2025 | €840,000 | 89 m |
| 210 Ballinteer Ave, Ballinteer, Dublin 16 | Jun 2026 | €730,000 | 109 m |
| 48 The Rise, Woodpark, Ballinteer | Feb 2026 | €720,000 | 170 m |
| 34 Ballinteer Park, Ballinteer, Dublin 16 | Feb 2025 | €635,000 | 185 m |
| 34a Ballinteer, Ballinteer, Dublin 16 | Jan 2025 | €700,000 | 186 m |
| 20 The Walk, Woodpark, Ballinteer Dublin 16 | Sept 2025 | €643,000 | 188 m |
| 56 Ballinteer Dr, Ballinteer, Dublin 16 | Apr 2025 | €690,000 | 226 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received29 June 2005
- Decision issued19 August 2005
- Appeal submitted14 September 2005
- Appeal decided22 February 2006
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted40 m away
Permission for the Retention of the conversion of a garage and utility room to habitable spaces; permission…
7 The Rise, Woodpark, Ballinteer, Dublin 16
D17B/0441Dún Laoghaire–RathdownLodged 25 Jan 2018Retention
- Invalid40 m away
The retention of the construction of a 31m2 flat-roof single storey extension, adjoining the south side of…
14, Ballinteer Court, Ballinteer, Dublin 16, D16XF82
D26B/0219/WEBDún Laoghaire–RathdownLodged 14 Apr 2026Retention
- Granted50 m away
Single storey extension to side of existing building. [LOCATION] 6 The Glade, Woodpark, Ballinteer, Dublin —…
6 The Glade, Woodpark, Ballinteer, Dublin 16.
D02B/0061Dún Laoghaire–RathdownLodged 8 Feb 2002Extension
- Granted50 m away
Permission is sought for a single storey domestic extension to the side and rear
6, The Glade, Ballinteer, Dublin 16
D11B/0105Dún Laoghaire–RathdownLodged 31 Mar 2011Extension
- Awaiting decision50 m away
The construction of a 13.5m2 flat-roof single storey extension, adjoining the south side of the property. The…
14, Ballinteer Court, Ballinteer, Dublin 16, D16XF82
D25B/0698/WEBDún Laoghaire–RathdownLodged 14 Dec 2025Extension
- Granted50 m away
Single storey extension to rear and first floor extension to side. [LOCATION] 18 The Lawn, Woodpark,…
18 The Lawn, Woodpark, Ballinteer, Dublin 16.
D02B/0035Dún Laoghaire–RathdownLodged 30 Jan 2002Extension
- Refused70 m away
Planning permission is sought for a two storey two bedroom semi-detached house attached to existing family…
8, The Rise, Woodpark, Ballinteer, Dublin 16
D08B/0543Dún Laoghaire–RathdownLodged 21 Jul 2008New dwelling
- Granted70 m away
Permission for an extension with a floor area measuring 8.19 sqm to an existing dwelling house
8 The Rise, Woodpark, Ballinteer, Dublin 16
D14B/0375Dún Laoghaire–RathdownLodged 6 Nov 2014Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- InvalidRetention
Retention planning permission is sought for two storey extension
6 Lutrell Park Crescent,, Carpenterstown,, Dublin 15,, D15V30Y
FW25A/0011EFingalLodged 16 Jan 2025
- GrantedRetention
Permission is sought for retention of development of a two storey extension to the rear
30, Booterstown Avenue, Booterstown, Co. Dublin
D09B/0428Dún Laoghaire–RathdownLodged 22 Oct 2009
- RefusedRetention
Retention of two storey extension to rear
16 The Avenue, Clonlea, Woodpark, Dublin 16
D14B/0363Dún Laoghaire–RathdownLodged 28 Oct 2014
- RefusedRetention
Retention of a two storey extension to the rear
12, Monastery Gate Green, Clondalkin, Dublin 22
SD07B/0601South DublinLodged 10 Jul 2007
- Awaiting decisionRetention
Retention of a two-storey extension to rear of dwelling
Dromina, Charleville, ,
136386corkLodged 16 Dec 2013
- RefusedRetention
Retention of two-storey extension to rear of existing dwelling
24 Assumption Villas, Rockenham, Pembroke, Passage West
086439corkLodged 1 May 2008
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.