Planning Permission Ireland
InvalidCommercialDecided 29 August 2007

Superquinn Unit, Ballinteer Shopping Centre, Ballinteer Road, Ballinteer, Dublin 16

Retention of a roofed storage area and permission for a new fire escape and shopfront alterations at Ballinteer Shopping Centre.

D07A/1019 · Dun Laoghaire Rathdown County Council · Lodged 20 July 2007

Reference
D07A/1019
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
20 July 2007

Summary

AI-generated

Permission is sought for the retention of a 288.55 square metre roofed storage area at the rear of the Superquinn unit. The application also includes installing a new rear external fire escape stairs and replacing brick panels with glazing and render on the Ballinteer Avenue elevation.

Commercialretailshopfront
Floor area
289 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permisison is sought for the following
  • 1) retention of a roofed area within the existing walled storage area to form an enclosed storage area of 288.55sqm at the rear of the existing unit
  • The provision of 1 no. Additional rear external fire escape stairs and caged enclosure serving the existing first floor staff area
  • The replacement of the existing brick panels along the ballinteer avenue elevation with a combination of new glazed sections and self-coloured rendered panels
  • The r

Land-use zoning

What this land is zoned for

Objective NCDC
NC To protect, provide for and-or improve mixed-use neighbourhood centre facilities.

National zoning type: District, neighbourhood centre

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
94 Ballinteer Dr, Ballinteer, Dublin 16Jun 2026€710,00051 m
56 Ballinteer Dr, Ballinteer, Dublin 16Apr 2025€690,000127 m
43 Ballinteer Crescent, Ballinteer, Dublin 16Jul 2025€690,000146 m
2a Broadford Rise, Ballinteer, Dublin 16Nov 2025€710,000149 m
24 Ballintyre Demense, Ballinteer, Dublin 16Feb 2025€402,500157 m
210 Ballinteer Ave, Ballinteer, Dublin 16Jun 2026€730,000182 m
37 Ballinteer Crescent, Ballinteer, Dublin 16Jul 2026€730,000186 m
4 The Glade, Woodpark, Ballinteer Dublin 16Jun 2026€715,000202 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 July 2007
  2. Decision issued29 August 2007

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.