Planning Permission Ireland
GrantedInfrastructureDecided 14 August 2008

Seapoint Dart Station, Seapoint Avenue, Blackrock, Co. Dublin

Replacement of the existing railway footbridge with a new steel bridge and lift shafts at Seapoint Station.

D08A/0715 · Dun Laoghaire Rathdown County Council · Lodged 20 June 2008

Reference
D08A/0715
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
20 June 2008

Summary

AI-generated

The project involves erecting a new 14.12m long steel railway footbridge with staircases and stone-clad lift shafts to provide mobility impaired access. It also includes removing the existing footbridge and temporarily removing an adjacent masonry wall.

Infrastructurerailwaybridgeaccessibilityinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

- the erection of a 14.12m long by 1.72m wide steel railway footbridge, including steel staircases, over the dublin to wexford line, to replace the existing footbridge, and the erection of stone-clad lift shafts attached to the new footbridge of dimensions 2.2m long by 2.07m wide by 8.47m high on both platforms, to facilitate full mobility impaired access to the station; - the removal of the existing footbridge; - the temporary removal of masonry wall adjacent to the existing station entrance...

Key dates

Timeline

  1. Application received20 June 2008
  2. Decision issued14 August 2008

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.