Planning Permission Ireland
RefusedExtensionDecided 29 January 2009

4, Rus-in-urbe Terrace, Glenageary Road Lower, Glenageary, Co. Dublin

Demolition of a rear kitchen and construction of a two-storey extension to a protected structure in Glenageary.

D08A/1284 · Dun Laoghaire Rathdown County Council · Lodged 26 November 2008

Reference
D08A/1284
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
26 November 2008

Summary

AI-generated

The project involves demolishing an existing single-storey rear kitchen and constructing a new two-storey rear extension. The existing protected structure at the front will be restored and refurbished with minor internal and external changes.

Extensionprotected structureextensionrestoration
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Demolishing of the rear, west, existing single storey kitchen, and the construction of a new 2 storey extension to the rear, west. The existing protected structure to the front, east, will be restored and refurbished with minor changes to the interior layout. There will be no changes to the east elevation and there will be minor changes to the south elevation of the existing protected structure.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Rus In Urbe Terrace, Glenageary Rd Lower, Dun LaoghaireNov 2025€2,150,00017 m
Apartment 11, Galway Bay Sea View Apts, SalthillJun 2025€335,00066 m
1 Glengara Close, Glenageary Rd Lower, Dun LaoghaireJan 2025€610,00067 m
6 Glengara Close, Glenageary Rd Lower, Dun LaoghaireApr 2025€653,000102 m
2 Crosthwaite Park South, Dun Laoghaire, DublinMar 2025€646,000151 m
Marniche, 27 Crosthwaite Park West, Dun LaoghaireJun 2026€2,075,000154 m
Kish View, 14 Crosthwaite Park South, Dun LaoghaireJun 2025€2,500,000155 m
40 Clarinda, Dunlaoghaire, Park EastMay 2026€1,350,000157 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 November 2008
  2. Decision issued29 January 2009
  3. Appeal submitted25 February 2009
  4. Appeal decided11 August 2009

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.