Planning Permission Ireland
GrantedCommercialDecided 22 April 2009

Former Texaco Petrol Station, Churchtown Road Upper, Churchtown, Dublin 14

Construction of a medical centre and pharmacy on the site of a former petrol station in Churchtown.

D08A/1334 · Dun Laoghaire Rathdown County Council · Lodged 26 March 2009

Reference
D08A/1334
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
26 March 2009

Summary

AI-generated

The development on a 0.38-acre site proposes a new 1,131 square metre medical centre and pharmacy. The project includes treatment rooms, a physiotherapy studio, 26 surface car parking spaces, and 16 bicycle spaces.

Commercialmedical centrepharmacyredevelopment
Floor area
1,131 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission sought for devleopment on 0.1547 hectare (0.38 acre) site. A 1,131 m2 medical centre and pharmacy; 26 no. Car parking spaces at surface level; 16 no. Covered bicycle parking spaces at surface level and all other site development works above and below ground, storage and ancillary accommodation required to facilitate the development. The development will comprise the following
  • Medical centre comprising treatment/consulting rooms, physiotherapy studio, and ancillary space in

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 June 2014.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Churchtown Lodge, Churchtown Rd Lower, Dublin 14Oct 2025€1,394,00038 m
Leinster Lodge, 129 Lower Churchtown Rd, Dublin 14Aug 2025€895,000159 m
2 Henley Park, Churchtown, Dublin 14Mar 2026€960,500173 m
Apt 1, 123 Lower Churchtown Rd, Churchtown Dublin 14Sept 2025€623,000180 m
10 Henley Park, Churchtown, Dublin 14Jan 2026€940,000181 m
25 Beaumont Dr, Churchtown, Dublin 14May 2025€640,000190 m
27 Beaumont Dr, Churchtown, Dublin 14Jul 2025€545,000197 m
13 Finsbury Green, Churchtown, Dublin 14Jun 2025€600,000204 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 March 2009
  2. Decision issued22 April 2009
  3. Appeal submitted19 May 2009
  4. Appeal decided23 September 2009

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.