Planning Permission Ireland
GrantedRetentionDecided 16 April 2009

21, South Avenue, Mount Merrion, Co. Dublin.

Retention and completion of works including rebuilding walls, a new roof, and extensions to a semi-detached house.

D09A/0015 · Dun Laoghaire Rathdown County Council · Lodged 24 March 2009

Reference
D09A/0015
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
24 March 2009

Summary

AI-generated

This application seeks permission for the retention and completion of works including the demolition and rebuilding of external walls, internal walls, and the roof. It also includes the construction of a two-storey extension to the front, side, and rear, and a single-storey extension to the rear of an existing semi-detached house.

Retentionextensionrebuildsuburban
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Retention and completion of works including demolition and rebuilding of rear, side and front external walls of house, demolition of internal walls at ground floor and first floor level, removal of roof and construction of new roof, all as part of construction of a two storey extension to front, side and rear and single storey extension to rear of existing two storey semi-detached house as previously approved under reg. Ref. D08a/0350, incorporating demolition of existing garage and sheds and...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
50 Cherry Garth, Mount Merrion, BlackrockMay 2025€1,275,00045 m
14 South Avenue, Mount Merrion, Co DublinSept 2025€920,00052 m
49 Thornhill Oaks, Cherry Garth, Mount Merrionprice excludes VATJan 2025€1,145,374104 m
24 South Ave, Mount Merrion, DublinDec 2025€1,580,000108 m
49 Thornhill Oaks, Cherry Garth, Mount MerrionDec 2025€1,430,135110 m
50 Thornhill Oaks, Cherry Garth, Mount MerrionSept 2025€1,500,000114 m
28 South Ave, Mount Merrion, DublinSept 2025€1,400,000126 m
15 Cherry Garth, Mount Merrion, BlackrockApr 2025€1,110,000148 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 March 2009
  2. Decision issued16 April 2009

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.