Planning Permission Ireland
GrantedAlterationsDecided 18 July 2013

2, Sorrento Terrace, Dalkey, Co. Dublin

Internal alterations, refurbishment, and landscaping works at a four-storey terraced house.

D13A/0266 · Dun Laoghaire Rathdown County Council · Lodged 24 May 2013

Reference
D13A/0266
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
24 May 2013

Summary

AI-generated

The development consists of internal alterations and refurbishment of an existing four-storey terraced dwelling. Works include new plumbing and wiring, re-roofing a vaulted cellar, modifying a rear window, external terracing, landscaping, repairing stone boundary walls, a new roof-light, and a solar panel.

Alterationsrefurbishmentsolarlandscaping
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development consisting of internal alterations and refurbishment of the existing four storey terraced dwelling to include new plumbing and wiring, the re-roofing of existing vaulted cellar to front of house, modification of window in rear elevation and associated external terracing and landscaping to the rear, including the repair and reinstatement of existing stone boundary walls, a new roof-light in roof above bathroom and solar panel. The internal alterations include, at ...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 7 May 2015.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Milano, Vico Road, DalkeyAug 2025€3,300,000232 m
13 Vico Rock, Sorrento Rd, DalkeyJan 2025€460,000294 m
Lilliput, Sorrento Rd, DalkeyJan 2025€571,040316 m
Nirvana, Coliemore Road, DalkeyFeb 2025€2,500,000330 m
18 Sorrento Court, Sorrento Rd, DalkeyApr 2026€585,000357 m
20 Sorrento Court, Sorrento Rd, DalkeyMay 2026€628,000357 m
1 Berwick House, Coliemore Road, DalkeyMay 2025€770,000358 m
Ingle Cottage, Knock Na Cree Road, DalkeyDec 2025€1,125,000457 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 May 2013
  2. Decision issued18 July 2013
  3. Appeal submitted1 August 2013
  4. Appeal decided21 November 2013

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.