Planning Permission Ireland
GrantedExtensionDecided 12 November 2013

18, Mulgrave Terrace, Dun Laoghaire, Co. Dublin

Demolition of single-storey rear structures and construction of a part two-storey rear extension.

D13A/0385 · Dun Laoghaire Rathdown County Council · Lodged 16 October 2013

Reference
D13A/0385
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
16 October 2013

Summary

AI-generated

The application is for the demolition of an existing single-storey kitchen, bathroom, and living room to the rear. It will be replaced with a part two-storey pitched and flat-roofed extension, alongside roof reinstatement and minor internal alterations.

Extensionextensiondemolitionterrace
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development consisting of: (1) the demolition of existing single-storey pitched and flat roofed kitchen, bathroom and living room to rear and (2) the erection of a pitched and flat roofed extension to rear and (3) the re-instatement of natural slate finish to front pitch of existing roof and minor internal alterations to existing pitched roofed, mid terraced house. The proposed extension shall be part two-storey, to have slate roof finished in natural slate and 2 no. Velux roo...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 11 August 2014. A completion certificate was lodged on 27 June 2019.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
21 Mulgrave Terrace, Dun Laoghaire, DublinJul 2025€1,400,00034 m
12 Mulgrave Terrace, Dun Laoghaire, DublinAug 2025€1,651,32469 m
3 Patrick Court, Patrick St, Dun LaoghaireJun 2026€585,000120 m
2 Patrick Court, Patrick St, Dun LaoghaireApr 2026€572,000125 m
Whitethorn, Royal Terrace West, Dun LaoghaireNov 2025€1,300,000141 m
32 Mulgrave St, Dun Laoghaire, DublinJul 2025€880,000144 m
Tivoli Mews, 7 Tivoli Terrace South, Dun LaoghaireMay 2025€1,110,000162 m
30 Mulgrave St, Dun Laoghaire, DublinNov 2025€1,800,000167 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 October 2013
  2. Decision issued12 November 2013
  3. Appeal submitted9 December 2013
  4. Appeal decided23 April 2014

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.