Planning Permission Ireland
RefusedChange of useDecided 7 January 2015

19 & 20 Patrick Street, Dun Laoghaire, Co Dublin

Conversion of two retail and residential buildings into two three-bedroom houses in Dun Laoghaire.

D14A/0705 · Dun Laoghaire Rathdown County Council · Lodged 5 November 2014

Reference
D14A/0705
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
5 November 2014

Summary

AI-generated

This application seeks to change the use of two retail/residential buildings into two three-bedroom houses. The works involve demolishing a rear extension, adding a new third floor level, constructing new rear extensions, and creating a third-storey balcony terrace.

Change of usechange of useconversiondemolition
Residential units
2
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for
  • Change of use of 2 no. Retail/residential apartment buildings to a 2 no. Three bedroom residential house
  • Demolition of two storey rear flat roof extension and outbuilding stores
  • Proposed plan and elevational alterations to main buildings at ground and first floors along with the addition of a proposed third floor level along with new two storey rear extensions to the main building with a third storey being used as a balcony terrace from bedroom 1.4. Construction

Land-use zoning

What this land is zoned for

Objective MTCUC
MTC To protect, provide for and-or improve major town centre facilities.

National zoning type: City/Town/village Centre, central area

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 June 2015. A completion certificate was lodged on 13 September 2016.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
22 Patrick St, Dun Laoghaire, DublinMar 2025€547,00018 m
91 Patrick St, Dun Laoghaire, DublinDec 2025€450,00031 m
85/86 Patrick Street, Dun Laoghaire, Co. DublinMar 2025€417,50047 m
21a Mulgrave St, Dun Laoghaire, DublinFeb 2026€840,00080 m
63 Mulgrave Street, Dun Laoghaire, Co. DublinOct 2025€765,000105 m
8 Northumberland Ave, Dun Laoghaire, DublinFeb 2025€1,100,000146 m
30 Mulgrave St, Dun Laoghaire, DublinNov 2025€1,800,000156 m
32 Mulgrave St, Dun Laoghaire, DublinJul 2025€880,000178 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 November 2014
  2. Decision issued7 January 2015
  3. Appeal submitted3 February 2015
  4. Appeal decided25 May 2015

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.