Planning Permission Ireland
GrantedAlterationsDecided 27 May 2015

Sayjip, Old Bray Road, Cabinteely, Dublin 18

Modifications to a previously approved but unbuilt house design.

D15A/0225 · Dun Laoghaire Rathdown County Council · Lodged 7 April 2015

Reference
D15A/0225
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
7 April 2015

Summary

AI-generated

The application seeks modifications to an unbuilt planning permission for a new house. Changes include a raised ridge height, new windows and roof lights, a new ground floor bay window, and a stepped roof design with clerestory windows.

Alterationshouse designamendment
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for modifications to the existing (unbuilt) planning permission for a new house (register reference d12a/0112)
  • New window on front (ne) elevation
  • Raise overall ridge height of two-storey part by 300mm
  • New roof light on front (ne) elevation
  • New ground floor bay window on side (se) elevation
  • New stepped roof design with clerestory windows over single-storey part to rear of house
  • Reduction of window ope sizes in various locations

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 3 October 2014.

4 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Ard Valley, Old Bray Road, Cabinteelyprice excludes VATJul 2026€726,872124 m
14 Beech Park, Cabinteely, DublinJun 2025€1,025,000180 m
82 Shrewsbury Lawn, Cabinteely, Dublin 18Jul 2025€1,000,000198 m
23 Carleton House, Brennanstown, Cabinteely Dublin 18Feb 2025€555,000222 m
5 Mercer House, Brennanstown Dublin 18, DublinJul 2025€450,000230 m
4 Mercer House, Brennanstown Square, CabinteelySept 2025€465,000230 m
57 Shrewsbury Lawn, Cabinteely, Dublin 18Feb 2025€1,200,000236 m
17 Rochford House, Brennanstown, Dublin 18Jun 2026€450,000241 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 April 2015
  2. Decision issued27 May 2015

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.