Planning Permission Ireland
GrantedCommercialDecided 8 January 2016

at a site including Infinity House and Media House, South County Business Park, Leopardstown, Dublin 18

Demolition of existing buildings and construction of three 5-storey office blocks in Leopardstown.

D15A/0695 · Dun Laoghaire Rathdown County Council · Lodged 5 November 2015

Reference
D15A/0695
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
5 November 2015

Summary

AI-generated

The project involves the demolition of approximately 3,000 sq m of existing structures. In their place, three new 5-storey office buildings with a total floor area of 26,525 sq m will be built, including ground-floor cafes and 298 parking spaces.

Commercialofficesdemolitionredevelopment
Storeys
5
Floor area
26,525 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development. The development will consist of: the demolition of all existing structures on the site (3,000 sq m approximately) and the provision of 3 no. New 5 storey office buildings (with rooftop plant and access set back from the building edge) known as blocks a, b, and c including undercroft and surface car parking (298 no. Spaces) with a total gross floor area of 26,525 sq m approximately. The development will also include ground floor cafes in blocks a and b (830 sq m); a...

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 February 2017. A completion certificate was lodged on 27 April 2022.

Notified floor area: 10,000

3 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 November 2015
  2. Decision issued8 January 2016

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.