Planning Permission Ireland
GrantedHousing estateDecided 19 September 2016

The Grove (which formed part of the lands at Our Lady's Grove Primary and Secondary School), Goatstown Road, Goatstown, Dublin 14

Amendments to a permitted housing development reducing the total number of units from 47 to 41.

D16A/0212 · Dun Laoghaire Rathdown County Council · Lodged 23 August 2016

Reference
D16A/0212
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
23 August 2016

Summary

AI-generated

Permission is sought to amend a permitted residential development at The Grove. The proposed changes to Terrace 4, Terrace 5, and Block 6 will reduce the overall scheme's total number of residential units by 6, from 47 permitted units down to 41.

Housing estateamendmenthousing
Residential units
41

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission to amend a permitted residential development (dún laoghaire-rathdown county council reg. Ref. D11a/0595), which has been subsequently amended by dún laoghaire-rathdown county council reg. Refs. D15a/0199 and d15a/0324, respectively) on a site area of 0.9443ha, approximately. The development will consist of amendments primary to terrace 4, terrace 5 and block 6, reducing the permitted scheme's total number of residential units by 6 no. (from 47 no. Units permitted to 41 no. Units p...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 November 2016. A completion certificate was lodged on 9 January 2020.

Notified floor area: 496

7 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 202, Bearna, 106 Goatstown Roadprice excludes VATApr 2025€700,44162 m
381 The Oak, Trimbleston, GoatstownNov 2025€680,000117 m
415 Trimbleston Garden, Goatstown Road, Dublin14Sept 2025€652,235128 m
368 The Oaks Trimblestown, Goatstown, Dublinprice excludes VATMar 2025€692,000143 m
345 The Oaks, Trimbleston, Goatstown RoadMar 2025€500,000154 m
58 Trimbleston, Goatstown Road, Dublin 14May 2025€562,500163 m
Apt.131 - Block 6, Trimblestown, Goatstown RoadJul 2025€535,000164 m
Apt.126 - Block 6, Trimbleston, Gaotstown RoadAug 2025€560,000164 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 August 2016
  2. Decision issued19 September 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.