Planning Permission Ireland
Part granted, part refusedExtensionDecided 5 September 2016

The Breakers, 68 Coliemore Road, Dalkey, Co Dublin

Demolition of an existing extension to build a new part-single, part-two-storey extension with a roof terrace and entrance alterations.

D16A/0303 · Dun Laoghaire Rathdown County Council · Lodged 11 August 2016

Reference
D16A/0303
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
11 August 2016

Summary

AI-generated

The project at Coliemore Road involves demolishing an existing extension and erecting a new part-single and part-two-storey extension. This will increase the total area of the semi-detached house from 82.87 sqm to 109.81 sqm and includes a concealed roof terrace and alterations to the vehicular entrance.

Extensionextensionterraceentrance
Floor area
110 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the demolition of existing single storey and part two storey extension (gr fl area 24.62sqm, 1st fl area 8.89sqm) and erection of new part single storey and part two storey extension (gr fl area 38.94sqm, 1st fl area 22.20sqm) including concealed roof terrace (area 10.44sqm), all to existing single storey semi-detached house (total area increased from 82.87sqm to 109.81sqm). The works also involve alteration of vehicular entrance and front garden layout.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 May 2017.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Berwick House, Coliemore Road, DalkeyMay 2025€770,00062 m
Nirvana, Coliemore Road, DalkeyFeb 2025€2,500,00094 m
Landfall, Green Rd, Dalkey Dublin 1Oct 2025€3,175,000101 m
E5 Coliemore, Coliemore Rd, DalkeyJun 2026€800,000136 m
Lilliput, Sorrento Rd, DalkeyJan 2025€571,040274 m
Inniscorrig, Colimore Road, DalkeyJun 2026€14,956,300281 m
Tearman, 9 Victoria Rd, DalkeyAug 2025€1,950,000294 m
2 Victoria Rd, Dalkey, DublinDec 2025€1,385,000337 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 August 2016
  2. Decision issued5 September 2016
  3. Appeal submitted29 September 2016
  4. Appeal decided10 February 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.