Planning Permission Ireland
Part granted, part refusedAlterationsDecided 10 October 2016

2 Ardenza Terrace, Seapoint, Monkstown, Co Dublin A94 Y6F3 (A Protected Strucutre)

Alterations and extensions to a three-storey over basement protected structure.

D16A/0434 · Dun Laoghaire Rathdown County Council · Lodged 13 September 2016

Reference
D16A/0434
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
13 September 2016

Summary

AI-generated

The application proposes works to a protected structure, including a new external staircase to the front light-well, a single-storey rear extension, and a new conservation roof-light. It also includes roof refurbishment and internal amendments.

Alterationsprotected structureextensionconservation
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the following works to the three storey over basement dwelling: construction of a new external staircase and pedestrian gate to front light-well from ground level to basement; construction of a single storey extension (11.3 sqm) and canopy to the ground floor rear return; construction of a new conservation roof-light in the two storey over basement return to the rear; refurbishment works to the roof and rear elevation changes as well as refurbishment and internal amendments to ...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 3 January 2017.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
St Marys, Tobernea Terrace, Seapoint AveFeb 2026€620,000112 m
Carrig Rua, Temple Crescent, BlackrockFeb 2026€1,500,000158 m
11 Seapoint Court, Blackrock, Co Dublinnot full market priceMar 2026€19,296168 m
14 Seapoint Court, Temple Crescent, BlackrockAug 2025€580,000168 m
12 Alma Rd, Monkstown, DublinMar 2025€1,900,000180 m
7 Seapoint Court, Temple Crescent, BlackrockMay 2025€530,000182 m
4 Seapoint Court, Temple Crescent, BlackrockAug 2025€440,000198 m
7 Temple Park Ave, Blackrock, DublinJun 2026€1,440,000206 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 September 2016
  2. Decision issued10 October 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.