Planning Permission Ireland
GrantedCommercialDecided 22 December 2016

The Chase Building, Carmanhall Road & Arkle Road, Sandyford Industrial Estate, Dublin 18

Alterations and a minor ground floor extension to the entrance lobby of an office building.

D16A/0814 · Dun Laoghaire Rathdown County Council · Lodged 4 November 2016

Reference
D16A/0814
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
4 November 2016

Summary

AI-generated

Permission and retention permission are sought for amendments to the existing east elevation, including replacing double doors with revolving doors. The project also includes a minor 12 sqm ground floor extension to the rear west elevation to expand the entrance lobby and reception area.

Commercialofficeextensionretention
Floor area
12 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission and retention permission sought for development consisting of
  • Amendments to part of the existing east elevation including replacement of existing double doors with revolving doors and replacement glazing
  • Minor extension of 12sqm at ground floor level to the rear west elevation facing the rear courtyard and associated amendments to elevation treatment. The minor extension will be used as part of the entrance lobby/reception area for the building. Retention permission sought fo

Land-use zoning

What this land is zoned for

Objective MOCUC
MOC To provide for a mix of uses. Which complements the inner core, but with less retail and residential and more emphasis on employment and services.

National zoning type: Other mix of uses

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 22 February 2017.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
124 The Forum, Ballymoss Rd, Sandyford Dublin 18May 2025€495,00073 m
121 The Forum, Ballymoss Rd, Sandyford Dublin 18Nov 2025€485,00073 m
Apt 97, The Forum, SandyfordJun 2025€488,000107 m
99 The Forum, Sandyford, Dublin 18Oct 2025€531,000107 m
95 The Forum, Ballymoss Rd, Sandyford Dublin 18Jun 2025€362,000107 m
Apt 22 Ballymoss Rd, Sandyford, Dublin 18Dec 2025€485,000115 m
74 The Forum, Ballymoss Rd, Sandyford Dublin 18Apr 2026€530,000115 m
44 The Forum, Ballymoss Road, SandyfordJun 2025€465,000123 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 November 2016
  2. Decision issued22 December 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.