Planning Permission Ireland
GrantedApartmentsDecided 29 December 2016

Brook House, Block C, Adelphi Centre, Corrig Avenue, Dun Laoghaire, County Dublin

Construction of three apartment units on a new setback fifth floor level, making it a six-storey building.

D16A/0834 · Dun Laoghaire Rathdown County Council · Lodged 11 November 2016

Reference
D16A/0834
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
11 November 2016

Summary

AI-generated

The development proposes adding a new setback fifth floor to create a six-storey over basement structure containing three apartment units (two 2-beds and one 1-bed) with balconies. It also includes the demolition of an existing roof-level plant room and reconfiguration of the basement car park.

Apartmentsapartmentsextensiondemolitionroof level
Residential units
3
Storeys
6

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission sought on foot of grant of planning permission reg. Ref. D16a/0095 for 3 no. Residential apartment units (2 no. Two bed units and 1 no. One bed unit) with associated balconies on a new additional floor, setback at fifth floor level, providing for a 6 storey over basement level structure. Permission is also sought for the demolition of the existing plant room at roof level, reconfiguration of the basement car park and all associated site development engineering and landscap...

Land-use zoning

What this land is zoned for

Objective MTCUC
MTC To protect, provide for and-or improve major town centre facilities.

National zoning type: City/Town/village Centre, central area

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 21 June 2017. A completion certificate was lodged on 8 January 2018.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Brook House, Corrig Avenue, Dun LaoghaireAug 2025€450,0006 m
Apartment 2, Brook House, Corrig AvenueFeb 2025€462,0006 m
Apt 24, Adelphi House, Upper Geogres StreetJan 2025€590,00055 m
31 Abbey Street, Cahir, TipperaryDec 2025€150,00062 m
Apt 8, Clarinda House, Clarinda Park WestDec 2025€580,00094 m
The Coach House, Sydenham Mews, Corrig AvenueJan 2026€750,000102 m
25 Clarinda House, Clarinda Park West, Dun LaoghaireJul 2026€357,500106 m
10 Corrig Ave, Dun Laoghaire, DublinNov 2025€1,286,250111 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 November 2016
  2. Decision issued29 December 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.