Planning Permission Ireland
GrantedExtensionDecided 29 May 2018

97 Shrewsbury Lawn, Cabinteely, Dublin 18

Part single-storey, part two-storey rear extension, first-floor side extension, and front extension with zinc cladding.

D18B/0062 · Dun Laoghaire Rathdown County Council · Lodged 2 May 2018

Reference
D18B/0062
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
2 May 2018

Summary

AI-generated

The development consists of a part single-storey, part two-storey rear extension, a first-floor side extension over the converted garage, and a single-storey front extension. It features roof lights, full-height glazing for a new stairs, and zinc cladding on the front elevation.

Extensionextensioncladdingglazing
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for a part single storey, part two storey extension to rere, first floor extension to side over existing converted garage and single storey extension to tv room to front with pitched roof over. Part single storey extension to rere to have flat roof with all first floor extensions to have pitched roofs with 4 no. Velux roof lights serving all bathrooms. Provide full height glazing to external wall to new stairs including part roof. Provide zinc cladding to front elevation of new...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 10 August 2018.

Notified floor area: 120

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
82 Shrewsbury Lawn, Cabinteely, Dublin 18Jul 2025€1,000,000119 m
8 Ard Valley, Old Bray Road, Cabinteelyprice excludes VATJul 2026€726,872196 m
57 Shrewsbury Lawn, Cabinteely, Dublin 18Feb 2025€1,200,000210 m
Green Gables, 56 Shrewsbury Lawn, CabinteelyJun 2025€950,000210 m
60 Shrewsbury Lawn, Cabinteely, Dublin 18Nov 2025€975,000219 m
44 Shrewsbury Lawn, Cabinteely, Dublin 18Feb 2025€1,100,000269 m
14 Beech Park, Cabinteely, DublinJun 2025€1,025,000270 m
Hillside, Bray Rd, Cabinteely Dublin 18Sept 2025€490,000286 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 May 2018
  2. Decision issued29 May 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.