Planning Permission Ireland
RefusedRetentionDecided 30 April 2019

Haddington House Hotel, 9-12 Haddington Terrace, Dun Laoghaire, Co Dublin, A96 F2R9 (A Protected Structure)

Retention of a large ducting system to the rear of a protected hotel structure.

D19A/0156 · Dun Laoghaire Rathdown County Council · Lodged 6 March 2019

Reference
D19A/0156
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission for Retention
Received
6 March 2019

Summary

AI-generated

Retention permission is sought for a large ducting system erected at the rear of the Haddington House Hotel. The applicant proposes to paint the ducting to match the exterior of the hotel, which is a protected structure.

Retentionretentionhotelprotected structure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for retention of a large ducting to the rear, which was erected without the benefit of a valid planning permission, and that does not constitute exempt development. It is proposed to paint the ducting in a colour that matches the exterior of the hotel.

Key dates

Timeline

  1. Application received6 March 2019
  2. Decision issued30 April 2019

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.