Planning Permission Ireland
GrantedNew dwellingDecided 7 November 2019

Ballybrack House, Military Road, Killiney, Co. Dublin

Construction of two detached houses in the grounds of a protected structure.

D19A/0516 · Dun Laoghaire Rathdown County Council · Lodged 11 October 2019

Reference
D19A/0516
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
11 October 2019

Summary

AI-generated

Permission is sought to construct two new two-storey, two-bedroom detached houses within the grounds of Ballybrack House, which is a protected structure. The works include relocating the boundary wall, widening the entrance, and modifying the driveway.

New dwellingprotected structureinfillgarden
Residential units
2
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Intend to apply for development for the construction of two no. Two storey two bed detached houses in the grounds of ballybrack house, a protected structure (with permission for conservation works under reg. Ref. D18a/0600). Relocation of boundary wall to military road and provision of footpath with minor widening of existing entrance by relocation of one existing gate pier and modification of existing driveway to provide access to the new houses with all related site works and landscaping.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 10 February 2020. A completion certificate was lodged on 16 August 2022.

Notified floor area: 205

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
20 Firgrove, Military Rd, KillineyJan 2026€507,500122 m
Cooleen, Mountain View Rd, BallybrackMar 2026€780,000164 m
Apt 83 Ridge Hall, Shanganagh Rd, BallybrackJun 2026€486,000188 m
Apt 97 Ridge Hall, Ballybrack, GlenagearyJun 2025€416,000189 m
Apt 76 Ridge Hall, Shangannagh Rd, Ballybrack VillageJan 2026€315,000202 m
75 Ridge Hall, Shanganagh Rd, BallybrackSept 2025€395,000202 m
Apt 74 Ridge Hall, Shangannagh Road, BallybrackDec 2025€315,000202 m
72 Ridge Hall, Shanganagh Rd, BallybrackApr 2026€300,000202 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 October 2019
  2. Decision issued7 November 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.