Planning Permission Ireland
RefusedNew dwellingDecided 2 October 2019

Site to rear of no.7 Booterstown Avenue, Booterstown, Blackrock, Co. Dublin

Construction of a new two-storey house to the rear of a protected structure in Booterstown.

D19A/0576 · Dun Laoghaire Rathdown County Council · Lodged 8 August 2019

Reference
D19A/0576
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
8 August 2019

Summary

AI-generated

The development involves splitting an existing site to build a new two-storey, flat-roofed dwelling to the rear of a protected structure. The project also includes alterations to an existing rear garage and associated services.

New dwellingprotected structureinfillflat roof
Residential unit
1
Storeys
2
Floor area
159 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the development of a new 2 storey, flat roofed dwelling with painted rear and masonry finish. (protected structure- dlr rps no. 14 / caca map no. 2). The development involves the splitting of the existing site in two while retaining the existing dwelling as is. The proposed site to the rear will have an area of 230m2 and the dwelling will have a total floor area of 158.9m2. The application also includes alterations of the existing 27.6m2 rear garage building, proposed services an...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 7 August 2020.

Notified floor area: 158

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Grotto Place, Booterstown, DublinAug 2025€1,100,00038 m
35 Castlecourt, Booterstown, BlackrockNov 2025€875,00056 m
6 Grotto Place, Booterstown, DublinNov 2025€950,00059 m
11 Grotto Place, Booterstown, DublinApr 2026€500,00064 m
50 Castle Court, Booterstown, Co DublinDec 2025€1,150,00065 m
49 Castlecourt, Booterstown, DublinDec 2025€1,360,00073 m
4 Booterstown Court 126, Booterstown, Rock RdJan 2026€500,00086 m
22 Beech Grove, Booterstown, DublinJul 2025€820,000100 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 August 2019
  2. Decision issued2 October 2019
  3. Appeal submitted25 October 2019
  4. Appeal decided11 March 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.