Planning Permission Ireland
GrantedNew dwellingDecided 24 November 2020

On a site of 0.031 ha, at 4 Rocklands, Harbour Road, Dalkey, Co. Dublin A96 CF76

Construction of a new two-bedroom split-level house with parking and access on Harbour Road.

D20A/0355 · Dun Laoghaire Rathdown County Council · Lodged 29 October 2020

Reference
D20A/0355
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
29 October 2020

Summary

AI-generated

The development consists of building a new 2-bedroom, split-level dwelling of approximately 96.8 sqm. The project includes private open space, one car parking space, bicycle storage, a PV panel, and new gated vehicular and pedestrian access.

New dwellingnew dwellinginfillcoastal
Residential unit
1
Floor area
97 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development. The proposed development will consist of the construction of 1 no. 2 bed, split level dwelling (approx. 96.8 sqm gfa) at approx. 2.7 m to 5.9 m in height with associated private open space, 1 no. Car parking space, bicycle storage, 1 no. Pv panel at roof level, bin storage, boundary treatment works and all associated site development and site services works. New gated vehicular and pedestrian access will be provided to the site via harbour road, and a new pedestria...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 4 July 2023.

Notified floor area: 96.8

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 Glencairn, Harbour Rd, DalkeyOct 2025€630,000101 m
3 Harbour Crescent, Harbour Rd, DalkeyOct 2025€2,600,000176 m
4 Church Hill Mews, Dalkey, DublinAug 2025€925,000279 m
10 Claddagh, Bailey View, Harbour RdOct 2025€675,000286 m
29 Bartra Rock, Harbour Rd, DalkeyOct 2025€1,250,000293 m
Luckington Cottage, Ulverton Road, DalkeyDec 2025€800,000299 m
12 Kilmore Bailey View, Harbour Rd, DalkeyDec 2025€950,000305 m
3 Innisboffin, Bailey View, DalkeyJan 2025€650,000315 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 October 2020
  2. Decision issued24 November 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.