Planning Permission Ireland
GrantedNew dwellingDecided 16 December 2020

8 Montpelier Parade, Monkstown, Co. Dublin a protected structure

Construction of three new houses behind a protected structure in Monkstown.

D20A/0551 · Dun Laoghaire Rathdown County Council · Lodged 20 November 2020

Reference
D20A/0551
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
20 November 2020

Summary

AI-generated

Permission is sought to construct three new houses (two part-two/part-three-storey, and one two-storey with attic accommodation) to the rear of a protected structure. The project includes the demolition of an existing shed.

New dwellingprotected structureinfill
Residential units
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for the construction of 2 no. Part two-storey part three-storey, three bedroom houses and 1 no. Two storey, three bedroom house with attic accommodation, all with associated balconies and garages, demolition of existing shed and associated siteworks to the rear.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 July 2023.

Notified floor area: 180

3 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
47 Montpelier Parade, Monkstown, DublinMar 2026€1,795,00060 m
29 Eaton Sq, Monkstown, DublinJan 2026€2,400,00065 m
13 Eaton Sq, Monkstown, DublinNov 2025€2,000,000130 m
14 Verona, Queenspark, Monkstown RdJun 2026€690,000134 m
15 Eaton Sq, Monkstown, DublinFeb 2026€2,600,000144 m
4 Queens Park, Monkstown, Co DublinJun 2026€3,875,000152 m
2 Greenville Court, Stradbrook Rd, BlackrockSept 2025€417,000176 m
7 Monkstown Road, Monkstown, Co DublinJul 2026€1,295,000184 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 November 2020
  2. Decision issued16 December 2020
  3. Appeal submitted20 January 2021
  4. Appeal decided5 July 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.