Planning Permission Ireland
GrantedExtensionDecided 24 March 2021

24 Flemingstown Park, Churchtown, Dublin 14

Partial demolition and extension of a house in Churchtown, including raising the roof height.

D20A/0668 · Dun Laoghaire Rathdown County Council · Lodged 26 February 2021

Reference
D20A/0668
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
26 February 2021

Summary

AI-generated

The project involves the partial demolition of the existing dwelling and a private garage to allow for a 96.6 square metre extension. The ridge height will be increased by 2 metres to accommodate first-floor bedrooms, and the front entrance will be rearranged for parking.

Extensionextensiondemolitionrenovation
Floor area
97 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission sought for partial demolition of existing dwelling-extending width of existing building- increasing ridge height by 2 metres to accommodate bedrooms at first floor with velux roof lights and standard windows to front and rear gable walls. Demolition of existing private garage. Existing dwelling 117.900 sq. Mts. Proposed extension 96.600 sq. Mts. Total 214.00 sq. Mts. Rearrangement of existing entrance to accommodate required parking.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 September 2021.

Notified floor area: 214

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
16 Charleville, Churchtown Rd Lower, Dublin 14not full market priceOct 2025€800,00058 m
40 Woodlawn Park, Churchtown, Dublin 14Mar 2026€985,000101 m
14 Glenbower Park, Churchtown, Dublin 14Jan 2026€2,435,000129 m
5 Woodlawn Grove, Churchtown, Dublin 14Jan 2026€520,000165 m
Apt 1, 123 Lower Churchtown Rd, Churchtown Dublin 14Sept 2025€623,000168 m
Leinster Lodge, 129 Lower Churchtown Rd, Dublin 14Aug 2025€895,000175 m
Frankfort Lodge, Dundrum, DublinDec 2025€1,809,397177 m
97a Highfield Park, Dundrum, Dublin 14Dec 2025€2,244,969180 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 February 2021
  2. Decision issued24 March 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.