Planning Permission Ireland
GrantedCommercialDecided 21 April 2021

On a site of c.1.4892 ha at Belfield, Foster's Ave, Blackrock, A94 X099

Construction of an extension to the existing NIBRT facility near a protected structure.

D20A/0794 · Dun Laoghaire Rathdown County Council · Lodged 25 March 2021

Reference
D20A/0794
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
25 March 2021

Summary

AI-generated

The development proposes an extension to the existing NIBRT facility, involving the removal of a pre-fabricated structure. The site is adjacent to the walls of a former walled garden associated with Merville House, which is a protected structure, though no works are proposed to the protected elements.

Commercialextensionnibrtprotected structure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development to construct an extension to the existing nibrt facility. The subject site contains the walls of the former walled garden associated with merville house, which (along with the associated gate posts and piers) is a protected structure outside the application site (no works are proposed to the walls of the former walled garden through the application, not to the protected structures). The proposed development will consist of: the removal of the existing pre-fabricated...

Land-use zoning

What this land is zoned for

Objective TLIED
TLI To facilitate, support and enhance the development of third level education institutions.

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 May 2022. A completion certificate was lodged on 6 July 2023.

Notified floor area: 1,500

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Foster Ave, Mt Merrion, DublinOct 2025€1,410,000295 m
32 St Thomas Rd, Mount Merrion, DublinMar 2025€1,900,000371 m
14 St Thomas Road, Mount Merrion, BlackrockJul 2025€1,750,000388 m
14 Mather Rd North, Mount Merrion, DublinJan 2026€1,845,000402 m
4 Mountbrook, Stillorgan Rd, BlackrockFeb 2026€397,000407 m
91 Foster'S Avenue, Mount Merrion, Co DublinJun 2026€1,495,000441 m
69 Glenomena Park, Booterstown, BlackrockNov 2025€1,180,000447 m
67 Glenomena Park, Booterstown, Co DublinJan 2025€1,335,000451 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 March 2021
  2. Decision issued21 April 2021
  3. Appeal submitted10 May 2021
  4. Appeal decided1 February 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.