Nypro, Corke Abbey, Bray, Co. Dublin A98 R208
Compliance submission for the Nypro site in Bray.
D20A/0816/C3 · Dun Laoghaire Rathdown County Council · Lodged 10 May 2024
- Reference
- D20A/0816/C3
- Authority
- Dun Laoghaire Rathdown County Council
- Register status
- In progress
- Type
- Compliance with Conditions
- Received
- 10 May 2024
Summary
AI-generatedThis application seeks to satisfy Condition number 2b of planning permission reference D20A/0816. The site is located at Nypro, Corke Abbey, Bray.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Compliance with condition no. 2b of d20a/0816
Land-use zoning
What this land is zoned for
“E To provide for economic development and employment.”
National zoning type: Industrial, enterprise, employment
Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 39 The Grove, Woodbrook Glen, Bray | Jul 2025 | €552,000 | 131 m |
| 59 The Grove Woodbrook Glen Bray, Wicklow | Apr 2025 | €400,000 | 138 m |
| 96 Shoreside Park, Sea Gardens, Brayprice excludes VAT | Dec 2025 | €524,229 | 145 m |
| 99 Shoreside Park, Sea Gardens, Brayprice excludes VAT | Dec 2025 | €440,529 | 145 m |
| 102 Shoreside Park, Sea Gardens, Brayprice excludes VAT | Dec 2025 | €524,229 | 145 m |
| 95 Shoreside Park Sea Gardens, Brayprice excludes VAT | Dec 2025 | €440,529 | 145 m |
| 100 Shoreside Park, Sea Gardens, Brayprice excludes VAT | Jan 2026 | €537,445 | 145 m |
| 104 Shoreside Park, Sea Gardens, Brayprice excludes VAT | Dec 2025 | €581,498 | 145 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received10 May 2024
- Decision due4 July 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted30 m away
Permission for Retention for overflow surface car park (58 no. car parking spaces) perimeter fabric screen…
Nypro, Corke Abbey, Bray, Co Dublin
D14A/0262Dún Laoghaire–RathdownLodged 31 Jul 2014Retention
- Granted40 m away
Permission for the reconfiguration of the existing layout of the overflow car park comprising 58 no. car…
Nypro, Corke Abbey, Bray, Co. Dublin A98 R208
D20A/0816Dún Laoghaire–RathdownLodged 9 Mar 2021Infrastructure
- Granted70 m away
Permission sought for two storey extension to rear of existing dwelling together with connection to all…
129 Corke Abbey, Bray, Co. Dublin
D21B/0223Dún Laoghaire–RathdownLodged 4 May 2021Extension
- Granted90 m away
Permission is sought to convert attic to living accommodation with dormer extension on rear roof slope
133, Corke Abbey, Bray, Co. Dublin
D11B/0278Dún Laoghaire–RathdownLodged 18 Aug 2011Extension
- Granted90 m away
Permission for the construction of a new infill building (770 sq.m. floor area) linking Building 1 and…
Nypro, Corke Abbey, Bray, Co Dublin A98 R208
D19A/0887Dún Laoghaire–RathdownLodged 27 Nov 2020Industrial
- Granted90 m away
New boundary fence to rear of Nypro Limited, the development will comprise of a 2.4 meter high palisade fence…
Corke Abbey Avenue, Bray, Co. Dublin
D04A/0940Dún Laoghaire–RathdownLodged 19 Aug 2004Commercial
- Granted90 m away
Permission for the installation pf 3,225 no. solar photovoltaic (PV) panels comprising an area of 5,965 sq.…
Jabil Healthcare, Corke Abbey, Bray, Co Dublin, A98 R208
D22A/0574Dún Laoghaire–RathdownLodged 5 Aug 2022Energy
- Granted90 m away
Permission for (1) the construction of a 2-storey extension (2,430 sq. m. floor area) to Building 2 - eaves…
Jabil Healthcare, Corke Abbey, Bray, Co Dublin, A98R208
D25A/0060/WEBDún Laoghaire–RathdownLodged 1 May 2025Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Compliance submissionOther
Compliance with condition no. 2 of D20A/0596
Hampstead Building (Block 90), The Park, Carrickmines Great & Jamestown, Dublin 18
D20A/0596/C4Dún Laoghaire–RathdownLodged 3 Mar 2023
- Compliance submissionOther
Compliance with Condition no.2 of Reg Ref no. D20A/0878
40, Hillcourt Road, Glenageary, Co Dublin
D20A/0878/C1Dún Laoghaire–RathdownLodged 14 Jun 2023
- Compliance submissionOther
Compliance with Condition No. 2a of Reg Ref D20A/0863
site of 0.03 hectares at 48, Sandycove Road, Dun Laoghaire, Co Dublin, A96K4W7
D20A/0863/C2Dún Laoghaire–RathdownLodged 6 Oct 2023
- Compliance submissionOther
Compliance with Condition no 2 of Reg Ref no. D21A/0916
4a, St. Begnet's Villas, Dalkey, Co Dublin
D21A/0916/C1Dún Laoghaire–RathdownLodged 16 Oct 2023
- Compliance submissionOther
Compliance with Condition No.2 of Reg Ref No.D20A/0118
20 Lanesville, Monkstown Farm, Dun Laoghaire, Co Dublin
D20A/0118/C1Dún Laoghaire–RathdownLodged 16 May 2025
- Compliance submissionOther
Compliance with Condition no.2 of Reg Ref no. ABP31016221 (D20A/0780)
25, Glenageary Road Upper, Glenageary, Co Dublin, A96VW21
D20A/0780/C1Dún Laoghaire–RathdownLodged 1 Jun 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.