Planning Permission Ireland
GrantedExtensionDecided 2 June 2021

21, Redesdale Road, Mount Merrion, Blackrock, Co Dublin, A94W0Y1

Demolition of a side garage and chimneys to build new side, rear, and attic dormer extensions.

D21A/0291 · Dun Laoghaire Rathdown County Council · Lodged 8 April 2021

Reference
D21A/0291
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
8 April 2021

Summary

AI-generated

The development consists of demolishing the existing side garage, garden sheds, and chimneys. It proposes a new single-storey side and rear extension, two front bay window extensions, and two new attic dormer extensions facing north and south. The widening of the existing vehicular entrance is also included.

Extensionextensiondormerdemolition
Floor area
43 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development. The development will consist of
  • Demolishing the existing side garage, garden sheds and chimneys
  • The construction of a new single storey extension to the side and rear of the house totalling 40 sqm
  • The construction of two bay window extensions to the front of house totalling 2.5 sq
  • The construction of a new attic dormer extension facing north
  • The construction of a new attic dormer extension facing south
  • The widening of the existing vehicular e

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 April 2022.

Notified floor area: 188

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
27 Redesdale Rd, Mount Merrion, DublinMay 2025€1,000,00045 m
13 Redesdale Rd, Mount Merrion, DublinSept 2025€850,00050 m
10 Redesdale Rd, Mount Merrion, Co DublinJun 2026€1,220,000141 m
7 Clonmore Rd, Mount Merrion, DublinSept 2025€1,400,000145 m
2 Redesdale Court, Redesdale Rd, Mount MerrionNov 2025€650,000233 m
21 Cedarmount Rd, Mount Merrion, DublinNov 2025€910,000233 m
71 Trees Road, Mount Merrion, Co DublinAug 2025€1,480,000235 m
72 Mount Anville Wood, Goatstown, Dublin 14Jul 2025€1,002,000262 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 April 2021
  2. Decision issued2 June 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.