Planning Permission Ireland
GrantedExtensionDecided 29 June 2022

Marlow, Green Road, Dalkey, Co Dublin, A96W728

Demolition of a two-storey extension and garage to build new two-storey and part single-storey extensions in Dalkey.

D22A/0313 · Dun Laoghaire Rathdown County Council · Lodged 6 May 2022

Reference
D22A/0313
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
6 May 2022

Summary

AI-generated

The development consists of the demolition of an existing two-storey flat-roofed extension and a single-storey garage. These will be replaced with a new two-storey extension featuring a hipped roof and front balcony, alongside a part single, part two-storey flat-roofed extension.

Extensiondemolitionextensionbalcony
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development at this site. The development will consist of demolition of existing 2 storey flat roofed extension with first floor balcony and replacement with new 2 storey extension with extended slate, hipped roof over and first floor, balcony to front/south west. Demolition of existing single storey garage and replacement with new part single part 2 storey flat roofed extension with rooflight to single storey element - all to south-east side of existing 2 storey hipped roof, s...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 20 January 2023.

Notified floor area: 266

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Nirvana, Coliemore Road, DalkeyFeb 2025€2,500,00056 m
1 Berwick House, Coliemore Road, DalkeyMay 2025€770,00065 m
Landfall, Green Rd, Dalkey Dublin 1Oct 2025€3,175,000133 m
E5 Coliemore, Coliemore Rd, DalkeyJun 2026€800,000187 m
Lilliput, Sorrento Rd, DalkeyJan 2025€571,040196 m
20 Sorrento Court, Sorrento Rd, DalkeyMay 2026€628,000267 m
18 Sorrento Court, Sorrento Rd, DalkeyApr 2026€585,000267 m
13 Vico Rock, Sorrento Rd, DalkeyJan 2025€460,000298 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 May 2022
  2. Decision issued29 June 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.