Planning Permission Ireland
GrantedNew dwellingDecided 24 October 2022

Summerville, 21 Cross Avenue, Booterstown, Co. Dublin, A94K1V0 (A Protected Structure)

Construction of a new part two-storey, part single-storey house within the grounds of a protected structure.

D22A/0325 · Dun Laoghaire Rathdown County Council · Lodged 27 September 2022

Reference
D22A/0325
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
27 September 2022

Summary

AI-generated

Permission is sought to build a new part two-storey, part single-storey dwelling adjoining an existing artist's studio. Located within the grounds of a protected structure, the works include a new dividing boundary wall, a replacement stone front wall, pedestrian gates, and a new vehicular entrance.

New dwellingnew houseprotected structureinfill
Residential unit
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development consisting of construction of new part 2 storey part single storey dwelling house adjoining existing artists studio located within the south western corner. Works will include a new dividing boundary fence/wall to the east side and the new dwelling. New selected stone replacement front wall the same height as existing along the southern boundary from cross avenue along pinehaven together with a separate pedestrian gates/ railing and a vehicular entrance all within t...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 October 2023. A completion certificate was lodged on 26 February 2025.

Notified floor area: 275

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Pinehaven, Cross Avenue, BlackrockJan 2026€1,340,00054 m
23 Cross Avenue, Blackrock, Co DublinDec 2025€2,375,00068 m
6 Willowmount, Booterstown, DublinApr 2025€1,650,000125 m
Bellevue, Cross Ave, BlackrockJul 2025€2,380,000179 m
9b Rosemount Terrace, Booterstown, Co DublinApr 2025€795,000184 m
Dunboden, Cross Ave, BlackrockJun 2026€2,325,000215 m
38 Hampton Crescent, St Helens Wood, Booterstown DublinApr 2026€1,100,000234 m
33 Cherbury Court, Booterstown Ave, BlackrockFeb 2025€495,000245 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 September 2022
  2. Decision issued24 October 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.