Planning Permission Ireland
RefusedCommercialDecided 14 September 2022

Leopardstown Racecourse, Leopardstown Road, Foxrock, Dublin 18.

Temporary use of lands at Leopardstown Racecourse as an ice rink with a marquee, parking, and a septic tank.

D22A/0535 · Dun Laoghaire Rathdown County Council · Lodged 21 July 2022

Reference
D22A/0535
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
21 July 2022

Summary

AI-generated

Permission is sought for the temporary use of a 0.85-hectare site at Leopardstown Racecourse as an ice rink. The development will feature a single marquee structure measuring 45m by 60m, 98 car parking spaces, a drop-off facility, an on-site generator, and a temporary septic tank.

Commercialtemporaryleisuremarquee

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for the temporary use of lands as a temporary ice rink utilising vehicular and pedestrian access at the south east corner of the site, provision of drop off facility and 98 no. Car parking spaces, temporary provision of septic tank, on site generator and temporary connection to local water mains and ancillary works within a fenced area of approx. 0.85ha. The proposed development will consist of one stand-alone marquee structure of 45.00m by 60.00m. The temporary use will ...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Torry, Brighton Rd, Foxrock Dublin 18May 2026€3,945,000236 m
8 Brighton Place, Brighton Rd, FoxrockAug 2025€1,275,000281 m
57 Brighton Wood, Foxrock, Dublin 18Sept 2025€685,000302 m
Rockfield, Brigton Rd Foxrock, Dublin 18Mar 2026€1,650,000314 m
70 Brighton Wood, Brighton Road, FoxrockJul 2025€915,000345 m
6 Dunboy, Brighton Rd, Foxrock Dublin 18Jun 2025€1,740,000348 m
95 Brighton Wood, Foxrock, Dublin 18Feb 2025€1,050,000360 m
74 Brighton Wood, Brighton Road, FoxrockOct 2025€987,500376 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 July 2022
  2. Decision issued14 September 2022
  3. Appeal submitted10 October 2022
  4. Appeal decided1 November 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.