Planning Permission Ireland
GrantedCommercialDecided 18 April 2023

37 Heather Road, Sandyford Business Park, Dublin 18, D18 R9T3

Temporary permission for an electric vehicle preparation and valeting centre with charging points.

D22A/1029 · Dun Laoghaire Rathdown County Council · Lodged 24 March 2023

Reference
D22A/1029
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
24 March 2023

Summary

AI-generated

The application seeks a 5-year temporary permission to install two lightweight aluminium frame buildings for electric vehicle preparation and wet valeting. The site will feature 12 exterior EV charging points, rainwater harvesting tanks, and associated site works.

Commercialev chargingtemporaryvaleting
Storey
1
Floor area
905 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • 5 year temporary permission for
  • Installation of single storey lightweight aluminium frame building (total area 800sqm) for use as an electric vehicle preparation centre. To include dry valeting, electric vehicle charging, handover bays, ancillary office and staff facilities. 2 non illuminated building signage. 3 installation of a seperate single storey lightweight aluminium frame building (total area 105sqm) for use as a wet valeting facility. 4 rainwaterharvesting tanks (total capacity 36000 litres) and below ground silt and petrol interceptor and attenuation 5.12 no. Electric vehicle exterior charging points. 6 all associated site works

Land-use zoning

What this land is zoned for

Objective OECOE
OE To provide for office and enterprise development.

National zoning type: Office, business/technology park and related

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 October 2023. A completion certificate was lodged on 2 August 2024.

Notified floor area: 919

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
39 Carmanhall Court, Sandyford, Dublin 18Aug 2025€535,000386 m
22 Carmanhall Court, Brewery Rd, Sandyford Dublin 18Oct 2025€566,000386 m
124 The Forum, Ballymoss Rd, Sandyford Dublin 18May 2025€495,000395 m
121 The Forum, Ballymoss Rd, Sandyford Dublin 18Nov 2025€485,000395 m
Apt 27 Carmanhall Court, Leopardstown, Dublin 18Jul 2025€495,000401 m
16 Carmanhall Court, Burton Hall Rd, SandyfordDec 2025€500,000401 m
No.20 Fernhill Gate, Leopardstown Road, Sandyfordprice excludes VATFeb 2026€513,761415 m
25 Carmanhall Court, Burton Hall Rd, SandyfordOct 2025€510,000419 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 March 2023
  2. Decision due20 April 2023
  3. Decision issued18 April 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.