Planning Permission Ireland
RefusedRetentionDecided 18 May 2023

Clonkeen Park, Dun laoghaire within the curtilage of The Highline & The Joinery (formerly Known as Mentac House), Dun Laoghaire Industrial Estate, Pottery Road, Dun Laoghaire, Co. Dublin

Retention of minor alterations to an approved cycle and pedestrian bridge.

D23A/0199 · Dun Laoghaire Rathdown County Council · Lodged 28 March 2023

Reference
D23A/0199
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission for Retention
Received
28 March 2023

Summary

AI-generated

The application seeks retention permission for minor alterations to an approved cycle and pedestrian bridge. Changes include repositioning the terminus points, altering the bridge gradient, reducing the width of the southern element to 2 metres, and modifying the landing area.

Retentioninfrastructurebridgecycleway

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Minor alterations to cycle/pedestrian bridge approved under d19a/0181 (abp pl06d. 305629) the alterations consist of (i) the repositioning of the terminus points within the clonkeen park and associated alteration to the gradient of the bridge, (ii) reduction in width from 4.16 to 2m on the southern bridge element where it terminates in clonkeen park. (iii) alterations to bridge landing area between the existing buildings, the highline and the joinery. (iv) minor seperation of central footpaths. (v) all landscaping and ancillary works necessary to facilitate the development.

Land-use zoning

What this land is zoned for

Objective FOS
F To preserve and provide for open space with ancillary active recreational amenities.

National zoning type: Open space, park

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
62 Clonkeen Rd, Deansgrange, DublinMar 2026€855,000187 m
141 Clonkeen Crescent, Dun Laoghaire, DublinJan 2026€760,000209 m
Cluain Mhuire, 112 Bothar Chluain Caoin, An Charraig DhubhJun 2025€850,000237 m
46 Clonkeen Rd, Deansgrange, BlackrockNov 2025€833,000238 m
73 Clonkeen Rd, Blackrock, DublinJan 2025€907,000265 m
28 Grange Crescent, Pottery Rd, Dun LaoghaireJun 2026€650,000269 m
23 Grange Crescent, Kill O The Grange, DublinMay 2025€780,000282 m
28 Clonkeen Rd, Blackrock, DublinAug 2025€860,000301 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 March 2023
  2. Decision due22 May 2023
  3. Decision issued18 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.